Usher's Millpond Dam
Key Takeaway
Usher's Millpond Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 14 ft (taller than 16.4% in GA) |
| Dam Length | 465 ft |
| Dam Type | Earth |
| Max Storage | 201 acre-ft |
| Normal Storage | 14 acre-ft |
| Surface Area | 9 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA02886 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Usher, Perry T.
Private
Nearby Dams
Forts Lake Dam
Stewart, GA
Low Hazard 20 ftHodchodkee Lake Dam
Stewart, GA
Low Hazard 13 ftLumpkin Sewage Treatment Plant Cell No. 1 Dam
Stewart, GA
Low Hazard 27 ftHolders Lake Dam
Stewart, GA
Low Hazard 25 ftWilliamson Lake Dam
Stewart, GA
Low Hazard 19 ftHalliday Lake Dam #1
Stewart, GA
Low Hazard 16 ftClaudia Halliday Lake Dam #2
Stewart, GA
Low Hazard 24 ftLoiselle Lake Dam
Stewart, GA
Low Hazard 26 ftFrequently Asked Questions
What is the hazard classification of Usher's Millpond Dam?
Usher's Millpond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Usher's Millpond Dam?
Usher's Millpond Dam is owned by Usher, Perry T. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Usher's Millpond Dam?
Usher's Millpond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Usher's Millpond Dam?
Usher's Millpond Dam has a dam height of 14 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Usher's Millpond Dam last inspected?