Lumpkin Sewage Treatment Plant Cell No. 1 Dam
Key Takeaway
Lumpkin Sewage Treatment Plant Cell No. 1 Dam is classified as low hazard in Georgia. It was completed in 1985 and is 41 years old. Its primary use is other.
Physical Details
| Dam Height | 27 ft (taller than 65.9% in GA) |
| Dam Type | Earth |
| Max Storage | 50 acre-ft |
| Normal Storage | 28 acre-ft |
| Surface Area | 11 acres |
| Year Completed | 1985 (41 years old) |
| NID ID | GA04761 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
City of Lumpkin
Local Government
Nearby Dams
Hodchodkee Lake Dam
Stewart, GA
Low Hazard 13 ftForts Lake Dam
Stewart, GA
Low Hazard 20 ftUsher's Millpond Dam
Stewart, GA
Low Hazard 14 ftHolders Lake Dam
Stewart, GA
Low Hazard 25 ftLoiselle Lake Dam
Stewart, GA
Low Hazard 26 ftSinger Pond Dam
Stewart, GA
Low Hazard 17 ftWilliamson Lake Dam
Stewart, GA
Low Hazard 19 ftHalliday Lake Dam #1
Stewart, GA
Low Hazard 16 ftFrequently Asked Questions
What is the hazard classification of Lumpkin Sewage Treatment Plant Cell No. 1 Dam?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Lumpkin Sewage Treatment Plant Cell No. 1 Dam?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam is owned by City of Lumpkin (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Lumpkin Sewage Treatment Plant Cell No. 1 Dam built?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam was completed in 1985, making it 41 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Lumpkin Sewage Treatment Plant Cell No. 1 Dam?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Lumpkin Sewage Treatment Plant Cell No. 1 Dam?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Lumpkin Sewage Treatment Plant Cell No. 1 Dam last inspected?
Lumpkin Sewage Treatment Plant Cell No. 1 Dam was last inspected on September 10, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.