Key Takeaway
Stidham Tract Dam is classified as low hazard in South Carolina. Its primary use is irrigation.
Physical Details
| Dam Height | 25 ft (taller than 62.5% in SC) |
| Max Storage | 20 acre-ft |
| Normal Storage | 11 acre-ft |
| NID ID | SC03524 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WINDY HILLS NORTH LLC
Private
Nearby Dams
R Joseph Richardson Dam
Fairfield, SC
Low Hazard 25 ftLoblolly Timberlands Dam
Fairfield, SC
Low Hazard 32 ftLake Ashley Dam
Richland, SC
Low Hazard 26 ftAveryt Family Dam 1
Fairfield, SC
Significant Hazard 21 ftMullers Lake
Richland, SC
Significant Hazard 26 ftBrown Pond Dam
Richland, SC
Low Hazard 32 ftFuller Pond Dam
Richland, SC
Significant Hazard 27 ftClinch Belser Dam
Fairfield, SC
Low Hazard 35 ftFrequently Asked Questions
What is the hazard classification of Stidham Tract Dam?
Stidham Tract Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Stidham Tract Dam?
Stidham Tract Dam is owned by WINDY HILLS NORTH LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Stidham Tract Dam?
Stidham Tract Dam serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Stidham Tract Dam?
Stidham Tract Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Stidham Tract Dam last inspected?
Stidham Tract Dam was last inspected on May 5, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.