Pyles Canyon 2

PYLES CREEK· Union, Oregon· Built 1977· Earth· 39 ft tall
Low Hazard Irrigation Private

Key Takeaway

Pyles Canyon 2 is classified as low hazard in Oregon. It was completed in 1977 and is 49 years old. Its primary use is irrigation.

Physical Details

Dam Height 39 ft (taller than 75.8% in OR)
Dam Length1,550 ft
Dam TypeEarth
Max Storage300 acre-ft
Normal Storage221 acre-ft
Surface Area25 acres
Drainage Area6 sq mi
Max Discharge164 cfs
Year Completed1977 (49 years old)
NID IDOR00654

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: August 5, 2019
State Regulated: Yes
Regulatory Agency: OWRD

Ownership

SEVEN DIAMOND RANCH

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Pyles Canyon 2?

Pyles Canyon 2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Pyles Canyon 2?

Pyles Canyon 2 is owned by SEVEN DIAMOND RANCH (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Pyles Canyon 2 built?

Pyles Canyon 2 was completed in 1977, making it 49 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Pyles Canyon 2?

Pyles Canyon 2 serves the following purposes: Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Pyles Canyon 2?

Pyles Canyon 2 has a dam height of 39 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Pyles Canyon 2 last inspected?

Pyles Canyon 2 was last inspected on August 5, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.