East Laterals Trinity WS SCS Site 3 Dam is classified as low hazard in Texas. It was completed in 1955 and is 71 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 27 ft (taller than 58.3% in TX) |
| Dam Length | 1,220 ft |
| Dam Type | Earth |
| Max Storage | 600 acre-ft |
| Normal Storage | 55 acre-ft |
| Surface Area | 14 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1955 (71 years old) |
| NID ID | TX00233 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
HENDERSON COUNTY;TRINITY NECHES SWCD
Local Government
Nearby Dams
East Laterals Trinity WS SCS Site 4 Dam
Henderson, TX
Low Hazard 36 ftEast Laterals Trinity WS SCS Site 1 Dam
Henderson, TX
Low Hazard 31 ftEast Laterals Trinity WS SCS Site 2 Dam
Henderson, TX
Low Hazard 44 ftKline Lake Dam
Henderson, TX
Low Hazard 17 ftCreslenn Ranch Dam
Henderson, TX
Low Hazard 7 ftCatfish Lake Dam
Anderson, TX
Low Hazard 18 ftLake Lodge Dam
Anderson, TX
Low Hazard 43 ftNichols Lake Dam
Henderson, TX
Low Hazard 20 ftFrequently Asked Questions
What is the hazard classification of East Laterals Trinity WS SCS Site 3 Dam?
East Laterals Trinity WS SCS Site 3 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates East Laterals Trinity WS SCS Site 3 Dam?
East Laterals Trinity WS SCS Site 3 Dam is owned by HENDERSON COUNTY;TRINITY NECHES SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was East Laterals Trinity WS SCS Site 3 Dam built?
East Laterals Trinity WS SCS Site 3 Dam was completed in 1955, making it 71 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of East Laterals Trinity WS SCS Site 3 Dam?
East Laterals Trinity WS SCS Site 3 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is East Laterals Trinity WS SCS Site 3 Dam?
East Laterals Trinity WS SCS Site 3 Dam has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was East Laterals Trinity WS SCS Site 3 Dam last inspected?
East Laterals Trinity WS SCS Site 3 Dam was last inspected on September 8, 2013. Inspection dates indicate when a formal review occurred, not the results of that inspection.