East Laterals Trinity WS SCS Site 2 Dam

TURKEY CREEK· Henderson, Texas· Built 1954· Earth· 44 ft tall
Low Hazard Flood Risk Reduction Local Government

Key Takeaway

East Laterals Trinity WS SCS Site 2 Dam is classified as low hazard in Texas. It was completed in 1954 and is 72 years old. Its primary use is flood risk reduction.

Physical Details

Dam Height 44 ft (taller than 89.1% in TX)
Dam Length3,050 ft
Dam TypeEarth
Max Storage10.5K acre-ft
Normal Storage433 acre-ft
Surface Area121 acres
Drainage Area20 sq mi
Max Discharge0 cfs
Year Completed1954 (72 years old)
NID IDTX00207

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: February 26, 1975
State Regulated: Yes
Regulatory Agency: TCEQ

Ownership

HENDERSON COUNTY;TRINITY NECHES SWCD

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of East Laterals Trinity WS SCS Site 2 Dam?

East Laterals Trinity WS SCS Site 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates East Laterals Trinity WS SCS Site 2 Dam?

East Laterals Trinity WS SCS Site 2 Dam is owned by HENDERSON COUNTY;TRINITY NECHES SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was East Laterals Trinity WS SCS Site 2 Dam built?

East Laterals Trinity WS SCS Site 2 Dam was completed in 1954, making it 72 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of East Laterals Trinity WS SCS Site 2 Dam?

East Laterals Trinity WS SCS Site 2 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is East Laterals Trinity WS SCS Site 2 Dam?

East Laterals Trinity WS SCS Site 2 Dam has a dam height of 44 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was East Laterals Trinity WS SCS Site 2 Dam last inspected?

East Laterals Trinity WS SCS Site 2 Dam was last inspected on February 26, 1975. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.