EAST MARTIN CREEK· Campbell, Wyoming· Built 2000· Earth· 30 ft tall

Key Takeaway

Cms Railroad Project Section 6 is classified as low hazard in Wyoming. It was completed in 2000 and is 26 years old. Its primary use is irrigation.

Physical Details

Dam Height 30 ft (taller than 63.1% in WY)
Dam Length804 ft
Dam TypeEarth
Max Storage78 acre-ft
Normal Storage44 acre-ft
Surface Area5 acres
Drainage Area0 sq mi
Max Discharge1,164 cfs
Year Completed2000 (26 years old)
Year Modified2004
NID IDWY02326

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: June 4, 2019
State Regulated: Yes
Regulatory Agency: SEO,DEQ

Ownership

FT RANCH, LLC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Cms Railroad Project Section 6?

Cms Railroad Project Section 6 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Cms Railroad Project Section 6?

Cms Railroad Project Section 6 is owned by FT RANCH, LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Cms Railroad Project Section 6 built?

Cms Railroad Project Section 6 was completed in 2000, making it 26 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Cms Railroad Project Section 6?

Cms Railroad Project Section 6 serves the following purposes: Irrigation, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Cms Railroad Project Section 6?

Cms Railroad Project Section 6 has a dam height of 30 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Cms Railroad Project Section 6 last inspected?

Cms Railroad Project Section 6 was last inspected on June 4, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.