Enl. P3-2
Key Takeaway
Enl. P3-2 is classified as low hazard in Wyoming. It was completed in 2008 and is 18 years old. Its primary use is fire protection.
Physical Details
| Dam Height | 40 ft (taller than 86.7% in WY) |
| Dam Length | 450 ft |
| Dam Type | Earth |
| Max Storage | 68 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 460 cfs |
| Year Completed | 2008 (18 years old) |
| NID ID | WY02445 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
EATON BROTHERS
Private
Nearby Dams
Mooney 10-5
Campbell, WY
Low Hazard 41 ftP16-5 Reservoir
Campbell, WY
Low Hazard 40 ftGates
Campbell, WY
Low Hazard 25 ftFloyd
Campbell, WY
Low Hazard 25 ftBoon
Campbell, WY
Low Hazard 32 ftWolff
Campbell, WY
Low Hazard 30 ftBroken Jaw Stock
Campbell, WY
Low Hazard 40 ftJuly
Campbell, WY
Low Hazard 24 ftFrequently Asked Questions
What is the hazard classification of Enl. P3-2?
Enl. P3-2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Enl. P3-2?
Enl. P3-2 is owned by EATON BROTHERS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Enl. P3-2 built?
Enl. P3-2 was completed in 2008, making it 18 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Enl. P3-2?
Enl. P3-2 serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Other, Irrigation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Enl. P3-2?
Enl. P3-2 has a dam height of 40 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Enl. P3-2 last inspected?
Enl. P3-2 was last inspected on May 18, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.