Clear Creek WS SCS Site 30 Dam is classified as high hazard in Texas. It was completed in 1962 and is 64 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 50 ft (taller than 93.5% in TX) |
| Dam Length | 1,025 ft |
| Dam Type | Earth |
| Max Storage | 448 acre-ft |
| Normal Storage | 54 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 1,784 cfs |
| Year Completed | 1962 (64 years old) |
| NID ID | TX00731 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CLEAR CREEK WATERSHED AUTHORITY;MONTAGUE COUNTY;UPPER ELM RED SWCD
Local Government
Nearby Dams
Clear Creek WS SCS Site 31 Dam
Cooke, TX
Significant Hazard 49 ftClear Creek WS SCS Site 27a Dam
Montague, TX
Low Hazard 50 ftClear Creek WS SCS Site 29 Dam
Montague, TX
Low Hazard 59 ftClear Creek WS SCS Site 28 Dam
Montague, TX
Low Hazard 46 ftC Smith Dam
Montague, TX
Low Hazard 26 ftClear Creek WS SCS Site 32 Dam
Cooke, TX
Low Hazard 48 ftHudspeth Dam
Cooke, TX
Low Hazard 26 ftClear Creek WS SCS Sed Cont Str 112
Montague, TX
Low Hazard 29 ftFrequently Asked Questions
What is the hazard classification of Clear Creek WS SCS Site 30 Dam?
Clear Creek WS SCS Site 30 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Clear Creek WS SCS Site 30 Dam?
Clear Creek WS SCS Site 30 Dam is owned by CLEAR CREEK WATERSHED AUTHORITY;MONTAGUE COUNTY;UPPER ELM RED SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Clear Creek WS SCS Site 30 Dam built?
Clear Creek WS SCS Site 30 Dam was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Clear Creek WS SCS Site 30 Dam?
Clear Creek WS SCS Site 30 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Clear Creek WS SCS Site 30 Dam?
Clear Creek WS SCS Site 30 Dam has a dam height of 50 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Clear Creek WS SCS Site 30 Dam last inspected?
Clear Creek WS SCS Site 30 Dam was last inspected on November 27, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.