Key Takeaway
Clear Creek WS SCS Site 3 Dam is classified as high hazard in Texas. It was completed in 1960 and is 66 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 55 ft (taller than 95.7% in TX) |
| Dam Length | 1,950 ft |
| Dam Type | Earth |
| Max Storage | 6.0K acre-ft |
| Normal Storage | 200 acre-ft |
| Surface Area | 32 acres |
| Drainage Area | 25 sq mi |
| Max Discharge | 60,354 cfs |
| Year Completed | 1960 (66 years old) |
| NID ID | TX02748 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BROWN COUNTY;PECAN BAYOU SWCD
Local Government
Nearby Dams
Clear Creek WS SCS Site 2 Dam
Brown, TX
Significant Hazard 30 ftClear Creek WS SCS Site 1 Dam
Brown, TX
High Hazard 40 ftClear Creek WS SCS Site 4 Dam
Brown, TX
High Hazard 45 ftClear Creek WS SCS Site 6 Dam
Brown, TX
High Hazard 50 ftOwens Lake Dam
Brown, TX
Low Hazard 20 ftCoggin Lake Dam
Brown, TX
Low Hazard 27 ftMcclatchey Dam
Coleman, TX
Low Hazard 20 ftClear Creek WS SCS Site 7 Dam
Brown, TX
Low Hazard 28 ftFrequently Asked Questions
What is the hazard classification of Clear Creek WS SCS Site 3 Dam?
Clear Creek WS SCS Site 3 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Clear Creek WS SCS Site 3 Dam?
Clear Creek WS SCS Site 3 Dam is owned by BROWN COUNTY;PECAN BAYOU SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Clear Creek WS SCS Site 3 Dam built?
Clear Creek WS SCS Site 3 Dam was completed in 1960, making it 66 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Clear Creek WS SCS Site 3 Dam?
Clear Creek WS SCS Site 3 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Clear Creek WS SCS Site 3 Dam?
Clear Creek WS SCS Site 3 Dam has a dam height of 55 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Clear Creek WS SCS Site 3 Dam last inspected?
Clear Creek WS SCS Site 3 Dam was last inspected on January 18, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.