Clear Creek WS SCS Site 7 Dam
Key Takeaway
Clear Creek WS SCS Site 7 Dam is classified as low hazard in Texas. It was completed in 1956 and is 70 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 28 ft (taller than 61.3% in TX) |
| Dam Length | 1,985 ft |
| Dam Type | Earth |
| Max Storage | 1.7K acre-ft |
| Normal Storage | 145 acre-ft |
| Surface Area | 32 acres |
| Drainage Area | 4 sq mi |
| Year Completed | 1956 (70 years old) |
| NID ID | TX02746 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BROWN COUNTY;PECAN BAYOU SWCD
Local Government
Nearby Dams
Coggin Lake Dam
Brown, TX
Low Hazard 27 ftClear Creek WS SCS Site 8 Dam
Brown, TX
Low Hazard 19 ftHarold Kennedy Dam
Brown, TX
Low Hazard 25 ftClear Creek WS SCS Site 6 Dam
Brown, TX
High Hazard 50 ftNortheast Laterals WS SCS Site 1 Dam
Brown, TX
Low Hazard 25 ftClear Creek WS SCS Site 1 Dam
Brown, TX
High Hazard 40 ftNortheast Laterals WS SCS Site 2 Dam
Brown, TX
Low Hazard 29 ftBrownwood Laterals WS SCS Site 4b Dam
Brown, TX
High Hazard 32 ftFrequently Asked Questions
What is the hazard classification of Clear Creek WS SCS Site 7 Dam?
Clear Creek WS SCS Site 7 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Clear Creek WS SCS Site 7 Dam?
Clear Creek WS SCS Site 7 Dam is owned by BROWN COUNTY;PECAN BAYOU SWCD (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Clear Creek WS SCS Site 7 Dam built?
Clear Creek WS SCS Site 7 Dam was completed in 1956, making it 70 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Clear Creek WS SCS Site 7 Dam?
Clear Creek WS SCS Site 7 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Clear Creek WS SCS Site 7 Dam?
Clear Creek WS SCS Site 7 Dam has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Clear Creek WS SCS Site 7 Dam last inspected?
Clear Creek WS SCS Site 7 Dam was last inspected on April 16, 2013. Inspection dates indicate when a formal review occurred, not the results of that inspection.