Big Sandy Creek WS SCS Site 25a Dam
Key Takeaway
Big Sandy Creek WS SCS Site 25a Dam is classified as low hazard in Texas. It was completed in 1988 and is 38 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 31 ft (taller than 70.6% in TX) |
| Dam Length | 1,970 ft |
| Dam Type | Earth |
| Max Storage | 342 acre-ft |
| Normal Storage | 51 acre-ft |
| Surface Area | 8 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1988 (38 years old) |
| NID ID | TX06843 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TARRANT REGIONAL WATER DISTRICT;WISE COUNTY;WISE COUNTY WCID;WISE SWCD
State Government
Nearby Dams
Big Sandy Creek WS SCS Site 28 Dam
Wise, TX
Low Hazard 39 ftHr Thompson Dam 2
Wise, TX
Low Hazard 42 ftBig Sandy Creek WS SCS Site 27 Dam
Wise, TX
Low Hazard 30 ftBig Sandy Creek WS SCS Site 14a Dam
Wise, TX
Low Hazard 33 ftPerch Hill Plant Dam
Wise, TX
Low Hazard 41 ftBig Sandy Creek WS SCS Site 26 Dam
Wise, TX
High Hazard 23 ftBig Sandy Creek WS SCS Site 23a Dam
Wise, TX
Low Hazard 38 ftBig Sandy Creek WS NRCS Dam No 33
Wise, TX
Low Hazard 35 ftFrequently Asked Questions
What is the hazard classification of Big Sandy Creek WS SCS Site 25a Dam?
Big Sandy Creek WS SCS Site 25a Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Big Sandy Creek WS SCS Site 25a Dam?
Big Sandy Creek WS SCS Site 25a Dam is owned by TARRANT REGIONAL WATER DISTRICT;WISE COUNTY;WISE COUNTY WCID;WISE SWCD (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Big Sandy Creek WS SCS Site 25a Dam built?
Big Sandy Creek WS SCS Site 25a Dam was completed in 1988, making it 38 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Big Sandy Creek WS SCS Site 25a Dam?
Big Sandy Creek WS SCS Site 25a Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Big Sandy Creek WS SCS Site 25a Dam?
Big Sandy Creek WS SCS Site 25a Dam has a dam height of 31 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.