Wormley Pond Dam
Key Takeaway
Wormley Pond Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 11 ft (taller than 4.7% in VA) |
| Dam Length | 210 ft |
| Dam Type | Earth |
| Max Storage | 108 acre-ft |
| Drainage Area | 1 sq mi |
| NID ID | VA199015 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DOI NPS
Federal Government
Nearby Dams
Roosevelt Pond Dam
York, VA
Significant Hazard 14 ftLee Hall Reservoir Dam
Newport News, VA
High Hazard 24 ftHarwood'S Mill Dam
York, VA
High Hazard 27 ftSkiffes Creek Dam
James City, VA
Low Hazard 16 ftSluice Dam
Newport News, VA
Unknown 16 ftKerry Lake Dam
Newport News, VA
Low Hazard 16 ftPenniman Lake Dam
York, VA
Low Hazard 9 ftYork Meadows Dam
York, VA
Unknown 15 ftFrequently Asked Questions
What is the hazard classification of Wormley Pond Dam?
Wormley Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Wormley Pond Dam?
Wormley Pond Dam is owned by DOI NPS (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Wormley Pond Dam?
Wormley Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Wormley Pond Dam?
Wormley Pond Dam has a dam height of 11 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Wormley Pond Dam last inspected?
Wormley Pond Dam was last inspected on December 6, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.