Worland Wastewater Treatment (Cell 3)
Key Takeaway
Worland Wastewater Treatment (Cell 3) is classified as low hazard in Wyoming. It was completed in 1992 and is 34 years old. Its primary use is other.
Physical Details
| Dam Height | 9 ft (taller than 2.3% in WY) |
| Dam Length | 2,000 ft |
| Dam Type | Earth |
| Normal Storage | 62 acre-ft |
| Surface Area | 33 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1992 (34 years old) |
| NID ID | WY02261 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CITY OF WORLAND
Local Government
Nearby Dams
Worland Wastewater Treatment (Cell 4)
Washakie, WY
Low Hazard 8 ftWorland Wastewater Treatment (Cell 2)
Washakie, WY
Low Hazard 12 ftWorland Wastewater Treatment (Cell 1)
Washakie, WY
Low Hazard 12 ftGreen Hills
Washakie, WY
Low Hazard 17 ftDm No. 1
Washakie, WY
Low Hazard 22 ftSore Paw
Washakie, WY
Low Hazard 26 ftBlake-Denton No. 2
Washakie, WY
Low Hazard 13 ftBlake-Denton No. 1
Washakie, WY
Low Hazard 15 ftFrequently Asked Questions
What is the hazard classification of Worland Wastewater Treatment (Cell 3)?
Worland Wastewater Treatment (Cell 3) is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Worland Wastewater Treatment (Cell 3)?
Worland Wastewater Treatment (Cell 3) is owned by CITY OF WORLAND (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Worland Wastewater Treatment (Cell 3) built?
Worland Wastewater Treatment (Cell 3) was completed in 1992, making it 34 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Worland Wastewater Treatment (Cell 3)?
Worland Wastewater Treatment (Cell 3) serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Worland Wastewater Treatment (Cell 3)?
Worland Wastewater Treatment (Cell 3) has a dam height of 9 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Worland Wastewater Treatment (Cell 3) last inspected?
Worland Wastewater Treatment (Cell 3) was last inspected on August 15, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.