Wildwood Lake Dam
Key Takeaway
Wildwood Lake Dam is classified as low hazard in Indiana. Its primary use is recreation.
Physical Details
| Dam Height | 32 ft (taller than 70.1% in IN) |
| Dam Length | 375 ft |
| Dam Type | Earth |
| Max Storage | 0 acre-ft |
| Normal Storage | 24 acre-ft |
| Surface Area | 1 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 0 cfs |
| NID ID | IN03787 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WILDWOOD ASSOCIATION
Private
Nearby Dams
Springs Valley Lake (F7)
Orange, IN
High Hazard 68 ftSvcd Structure No. F-6 (Collins Lake)
Orange, IN
High Hazard 45 ftSvcd Structure No. F-3 (Galloway Lake)
Orange, IN
High Hazard 40 ftSvcd Structure No. F-2
Orange, IN
Low Hazard 41 ftOlinger Lake Dam
Orange, IN
Low Hazard 37 ftPatoka Dam
Dubois, IN
High HazardFrequently Asked Questions
What is the hazard classification of Wildwood Lake Dam?
Wildwood Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Wildwood Lake Dam?
Wildwood Lake Dam is owned by WILDWOOD ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Wildwood Lake Dam?
Wildwood Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Wildwood Lake Dam?
Wildwood Lake Dam has a dam height of 32 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Wildwood Lake Dam last inspected?
Wildwood Lake Dam was last inspected on January 29, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.