Weller Pond Dam
Key Takeaway
Weller Pond Dam is classified as low hazard in New York. Its primary use is fire protection.
Physical Details
| Dam Height | 15 ft (taller than 37.1% in NY) |
| Dam Length | 225 ft |
| Dam Type | Earth |
| Max Storage | 348 acre-ft |
| Normal Storage | 232 acre-ft |
| Surface Area | 58 acres |
| Max Discharge | 480 cfs |
| NID ID | NY01378 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WOODWISE FORESTLAND LLC
Private
Nearby Dams
Eli Sochia Dam
St. Lawrence, NY
Low Hazard 10 ftSt. Regis Falls
Franklin, NY
Low Hazard 10 ftBlake
St. Lawrence, NY
High Hazard 80 ftCarry Falls Spillway
St. Lawrence, NY
High Hazard 76 ftStark Falls Dike G
St. Lawrence, NY
Significant Hazard 10 ftMadawaska Pond Dam
Franklin, NY
Low Hazard 7 ftFrequently Asked Questions
What is the hazard classification of Weller Pond Dam?
Weller Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Weller Pond Dam?
Weller Pond Dam is owned by WOODWISE FORESTLAND LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Weller Pond Dam?
Weller Pond Dam serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Weller Pond Dam?
Weller Pond Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Weller Pond Dam last inspected?
Weller Pond Dam was last inspected on June 13, 1994. Inspection dates indicate when a formal review occurred, not the results of that inspection.