Weaver Pond Dam
Key Takeaway
Weaver Pond Dam is classified as low hazard in Georgia. Its primary use is other.
Physical Details
| Dam Height | 8 ft (taller than 0.9% in GA) |
| Dam Length | 765 ft |
| Dam Type | Earth |
| Max Storage | 278 acre-ft |
| Normal Storage | 171 acre-ft |
| Surface Area | 57 acres |
| Drainage Area | 305 sq mi |
| NID ID | GA03557 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Wayne Sayer
Private
Nearby Dams
Paulk Pond Dam West
Irwin, GA
Low Hazard 11 ftOcilla Farms Pond Dam
Irwin, GA
Low Hazard 9 ftWalters Lake Dam
Irwin, GA
Low Hazard 20 ftOld Dismukes Pond Dam
Irwin, GA
Low Hazard 12 ftCypress Road Lake Dam
Irwin, GA
Low Hazard 12 ftAlta Lake Dam
Irwin, GA
Low Hazard 13 ftTurk Lake Dam North
Irwin, GA
Low Hazard 12 ftHogan Irrigation Pond Dam
Irwin, GA
Low Hazard 8 ftFrequently Asked Questions
What is the hazard classification of Weaver Pond Dam?
Weaver Pond Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Weaver Pond Dam?
Weaver Pond Dam is owned by Wayne Sayer (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Weaver Pond Dam?
Weaver Pond Dam serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Weaver Pond Dam?
Weaver Pond Dam has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Weaver Pond Dam last inspected?
Weaver Pond Dam was last inspected on October 1, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.