Walnut Creek Dam is classified as significant hazard in Virginia. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 42 ft (taller than 88.8% in VA) |
| Dam Length | 511 ft |
| Dam Type | Earth |
| Max Storage | 503 acre-ft |
| Normal Storage | 359 acre-ft |
| Surface Area | 22 acres |
| Drainage Area | 1 sq mi |
| NID ID | VA145034 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Hopson LLC
Private
Nearby Dams
Blenheim Road Mid-E Dam
Powhatan, VA
Unknown 25 ftBlenheim Road Se Dam
Powhatan, VA
Unknown 23 ftBevins Pond Dam
Powhatan, VA
Unknown 15 ftBlenheim Road Sw Dam
Powhatan, VA
Unknown 30 ftNixons Dam
Powhatan, VA
Unknown 22 ftMartin Dam
Powhatan, VA
Unknown 21 ftFlippen Dam
Cumberland, VA
Unknown 20 ftMcquade Dam
Powhatan, VA
Unknown 27 ftFrequently Asked Questions
What is the hazard classification of Walnut Creek Dam?
Walnut Creek Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Walnut Creek Dam?
Walnut Creek Dam is owned by Hopson LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Walnut Creek Dam?
Walnut Creek Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Walnut Creek Dam?
Walnut Creek Dam has a dam height of 42 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Walnut Creek Dam last inspected?