Vrasidas Dam

MOMBACCUS CREEK· Ulster, New York· Built 1947· Concrete· 12 ft tall
Significant Hazard Recreation Private

Key Takeaway

Vrasidas Dam is classified as significant hazard in New York. It was completed in 1947 and is 79 years old. Its primary use is recreation. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 12 ft (taller than 23.2% in NY)
Dam Length200 ft
Dam TypeConcrete
Max Storage4 acre-ft
Normal Storage3 acre-ft
Surface Area1 acres
Drainage Area1 sq mi
Year Completed1947 (79 years old)
NID IDNY14723

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: June 26, 2019
State Regulated: Yes
Regulatory Agency: NYS DEC

Ownership

MPV LAZY ACRES INC.

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Vrasidas Dam?

Vrasidas Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Vrasidas Dam?

Vrasidas Dam is owned by MPV LAZY ACRES INC. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Vrasidas Dam built?

Vrasidas Dam was completed in 1947, making it 79 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Vrasidas Dam?

Vrasidas Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Vrasidas Dam?

Vrasidas Dam has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Vrasidas Dam last inspected?

Vrasidas Dam was last inspected on June 26, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.