Victor Braunig Dam

ARROYO SECO· Bexar, Texas· Built 1963· Earth· 76 ft tall
High Hazard Hydroelectric Other Recreation Local Government

Key Takeaway

Victor Braunig Dam is classified as high hazard in Texas. It was completed in 1963 and is 63 years old. Its primary use is hydroelectric. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 76 ft (taller than 98.5% in TX)
Dam Length9,638 ft
Dam TypeEarth
Max Storage32.3K acre-ft
Normal Storage26.5K acre-ft
Surface Area1,350 acres
Drainage Area9 sq mi
Max Discharge16,944 cfs
Year Completed1963 (63 years old)
NID IDTX01432

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: March 7, 2018
State Regulated: Yes
Regulatory Agency: TCEQ

Ownership

CITY PUBLIC SERVICE ENERGY

Local Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Victor Braunig Dam?

Victor Braunig Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Victor Braunig Dam?

Victor Braunig Dam is owned by CITY PUBLIC SERVICE ENERGY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Victor Braunig Dam built?

Victor Braunig Dam was completed in 1963, making it 63 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Victor Braunig Dam?

Victor Braunig Dam serves the following purposes: Hydroelectric, Other, Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Victor Braunig Dam?

Victor Braunig Dam has a dam height of 76 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Victor Braunig Dam last inspected?

Victor Braunig Dam was last inspected on March 7, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.