Vernon Pond Dam
Key Takeaway
Vernon Pond Dam is classified as high hazard in Georgia. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 29 ft (taller than 73.2% in GA) |
| Dam Type | Earth |
| Max Storage | 25 acre-ft |
| Normal Storage | 20 acre-ft |
| NID ID | GA07652 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Wright, Chris
Private
Nearby Dams
Northwood Detention Dam
Columbia, GA
Low Hazard 28 ftHardy Lake Dam
Columbia, GA
Low Hazard 22 ftWoodbridge Lake Dam
Columbia, GA
High Hazard 31 ftSilver Lake Dam
Columbia, GA
Low Hazard 26 ftCamelot Lake Dam
Columbia, GA
Low Hazard 21 ftLake Jean Dam
Columbia, GA
Low Hazard 21 ftWinslow Lake Dam
Columbia, GA
Low Hazard 27 ftJones Creek Lake Dam
Columbia, GA
Low Hazard 19 ftFrequently Asked Questions
What is the hazard classification of Vernon Pond Dam?
Vernon Pond Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Vernon Pond Dam?
Vernon Pond Dam is owned by Wright, Chris (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Vernon Pond Dam?
Vernon Pond Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Vernon Pond Dam?
Vernon Pond Dam has a dam height of 29 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Vernon Pond Dam last inspected?
Vernon Pond Dam was last inspected on February 2, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.