Tyson Fresh Meats Pasco Brine Pond 8
Key Takeaway
Tyson Fresh Meats Pasco Brine Pond 8 is classified as significant hazard in Washington. It was completed in 2010 and is 16 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Length | 1,600 ft |
| Dam Type | Earth |
| Max Storage | 38 acre-ft |
| Normal Storage | 27 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 1 cfs |
| Year Completed | 2010 (16 years old) |
| Year Modified | 2010 |
| NID ID | WA02032 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Tyson Foods
Private
Nearby Dams
Tyson Fresh Meats Brine Pond 7
Walla Walla, WA
Significant HazardTyson Fresh Meats Lagoons 1 2 3
Walla Walla, WA
Significant HazardTyson Fresh Meats Storage Pond 4
Walla Walla, WA
High HazardSimplot Feeders Waste Pond No1
Walla Walla, WA
Significant HazardFlat Top Ranch Frost Control Pond
Walla Walla, WA
High HazardIce Harbor Lock and Dam
Walla Walla, WA
High HazardWest Bank Project Reservoir
Franklin, WA
High HazardFinley Ranch Reservoir
Benton, WA
High HazardFrequently Asked Questions
What is the hazard classification of Tyson Fresh Meats Pasco Brine Pond 8?
Tyson Fresh Meats Pasco Brine Pond 8 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Tyson Fresh Meats Pasco Brine Pond 8?
Tyson Fresh Meats Pasco Brine Pond 8 is owned by Tyson Foods (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Tyson Fresh Meats Pasco Brine Pond 8 built?
Tyson Fresh Meats Pasco Brine Pond 8 was completed in 2010, making it 16 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Tyson Fresh Meats Pasco Brine Pond 8?
Tyson Fresh Meats Pasco Brine Pond 8 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
When was Tyson Fresh Meats Pasco Brine Pond 8 last inspected?
Tyson Fresh Meats Pasco Brine Pond 8 was last inspected on October 5, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.