Tovar Ranch Lake No 2 Dam
Key Takeaway
Tovar Ranch Lake No 2 Dam is classified as low hazard in Texas. It was completed in 1974 and is 52 years old.
Physical Details
| Dam Height | 15 ft (taller than 15.4% in TX) |
| Dam Length | 1,800 ft |
| Dam Type | Earth |
| Max Storage | 300 acre-ft |
| Normal Storage | 104 acre-ft |
| Surface Area | 29 acres |
| Drainage Area | 0 sq mi |
| Year Completed | 1974 (52 years old) |
| NID ID | TX05352 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
WILLIAM BLAKEMOORE
Private
Nearby Dams
Tovar Ranch Lake No 1 Dam
Maverick, TX
Low Hazard 12 ftCage Lake No 1 Dam
Maverick, TX
Low Hazard 16 ftTovar Ranch Lake No 3 Dam
Maverick, TX
Low Hazard 12 ftCage Lake No 2 Dam
Maverick, TX
Low Hazard 14 ftGlass Ranch Big Tank Dam
Maverick, TX
Low Hazard 10 ftGlass Ranch House Tank Dam
Maverick, TX
Low Hazard 20 ftCarter Lake No 1 Dam
Maverick, TX
Low Hazard 10 ftCarter Lake No 2 Dam
Maverick, TX
Low Hazard 16 ftFrequently Asked Questions
What is the hazard classification of Tovar Ranch Lake No 2 Dam?
Tovar Ranch Lake No 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Tovar Ranch Lake No 2 Dam?
Tovar Ranch Lake No 2 Dam is owned by WILLIAM BLAKEMOORE (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Tovar Ranch Lake No 2 Dam built?
Tovar Ranch Lake No 2 Dam was completed in 1974, making it 52 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
How tall is Tovar Ranch Lake No 2 Dam?
Tovar Ranch Lake No 2 Dam has a dam height of 15 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.