Tipton Lake North Dam
Key Takeaway
Tipton Lake North Dam is classified as high hazard in Indiana. It was completed in 1982 and is 44 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 33 ft (taller than 72.9% in IN) |
| Dam Length | 1,800 ft |
| Dam Type | Earth |
| Max Storage | 1.4K acre-ft |
| Normal Storage | 1.1K acre-ft |
| Surface Area | 115 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 0 cfs |
| Year Completed | 1982 (44 years old) |
| NID ID | IN03739 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
TIPTON LAKES COMMUNITY ASSOCIATION
Private
Nearby Dams
Tipton Lake East Dam
Bartholomew, IN
High Hazard 28 ftTerrace Lake Dam
Bartholomew, IN
High Hazard 21 ftTipton Lake West Dam
Bartholomew, IN
High Hazard 30 ftWood Lake Dam
Bartholomew, IN
Significant Hazard 15 ftBittersweet Lake Dam
Bartholomew, IN
Significant Hazard 25 ftWhite Oak Lake Dam
Bartholomew, IN
Significant Hazard 15 ftHarrison Lakes South Dam
Bartholomew, IN
High Hazard 50 ftHarrison Lakes North Dam
Bartholomew, IN
High Hazard 38 ftFrequently Asked Questions
What is the hazard classification of Tipton Lake North Dam?
Tipton Lake North Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Tipton Lake North Dam?
Tipton Lake North Dam is owned by TIPTON LAKES COMMUNITY ASSOCIATION (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Tipton Lake North Dam built?
Tipton Lake North Dam was completed in 1982, making it 44 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Tipton Lake North Dam?
Tipton Lake North Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Tipton Lake North Dam?
Tipton Lake North Dam has a dam height of 33 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Tipton Lake North Dam last inspected?
Tipton Lake North Dam was last inspected on September 18, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.