Timberlake Phase 5

TR-BIG BEAR CREEK· Tarrant, Texas· Built 1995· Concrete· 12 ft tall
Significant Hazard Other Private

Key Takeaway

Timberlake Phase 5 is classified as significant hazard in Texas. It was completed in 1995 and is 31 years old. Its primary use is other. Significant hazard means failure could cause economic or environmental damage. Learn more.

Physical Details

Dam Height 12 ft (taller than 7.4% in TX)
Dam Length350 ft
Dam TypeConcrete
Max Storage37 acre-ft
Normal Storage18 acre-ft
Surface Area3 acres
Drainage Area1 sq mi
Max Discharge1,900 cfs
Year Completed1995 (31 years old)
NID IDTX09321

Safety Information

Significant Hazard

No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: June 9, 2022
State Regulated: Yes
Regulatory Agency: TCEQ

Ownership

TIMBER LAKE RESIDENTIAL ASSOCIATION INC

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Timberlake Phase 5?

Timberlake Phase 5 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Timberlake Phase 5?

Timberlake Phase 5 is owned by TIMBER LAKE RESIDENTIAL ASSOCIATION INC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Timberlake Phase 5 built?

Timberlake Phase 5 was completed in 1995, making it 31 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Timberlake Phase 5?

Timberlake Phase 5 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Timberlake Phase 5?

Timberlake Phase 5 has a dam height of 12 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Timberlake Phase 5 last inspected?

Timberlake Phase 5 was last inspected on June 9, 2022. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.