Thomas Mccants Dam
Key Takeaway
Thomas Mccants Dam is classified as low hazard in South Carolina. Its primary use is recreation.
Physical Details
| Dam Height | 16 ft (taller than 28.8% in SC) |
| Max Storage | 60 acre-ft |
| Normal Storage | 48 acre-ft |
| Surface Area | 6 acres |
| NID ID | SC02442 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
JUNICE G BORRINI
Private
Nearby Dams
Polin Pond Dam
Calhoun, SC
Low Hazard 18 ftShuler Dam
Orangeburg, SC
Significant Hazard 18 ftHouck Pond Dam
Calhoun, SC
Significant Hazard 16 ftBlue Circle Dam
Orangeburg, SC
Low Hazard 10 ftGasque Farm Dam
Orangeburg, SC
Low Hazard 17 ftLake Clare Dam
Orangeburg, SC
Low Hazard 15 ftHolman Pond Dam
Calhoun, SC
Low Hazard 15 ftGeorge Rast Pond Dam
Calhoun, SC
Low Hazard 11 ftFrequently Asked Questions
What is the hazard classification of Thomas Mccants Dam?
Thomas Mccants Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Thomas Mccants Dam?
Thomas Mccants Dam is owned by JUNICE G BORRINI (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Thomas Mccants Dam?
Thomas Mccants Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Thomas Mccants Dam?
Thomas Mccants Dam has a dam height of 16 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Thomas Mccants Dam last inspected?
Thomas Mccants Dam was last inspected on July 13, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.