Temple Eastex Dam B 2
Key Takeaway
Temple Eastex Dam B 2 is classified as high hazard in Texas. It was completed in 1965 and is 61 years old. Its primary use is other. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 17 ft (taller than 23.1% in TX) |
| Dam Length | 1,300 ft |
| Dam Type | Earth |
| Max Storage | 134 acre-ft |
| Normal Storage | 96 acre-ft |
| Surface Area | 17 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 72 cfs |
| Year Completed | 1965 (61 years old) |
| NID ID | TX03510 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
GEORGIA-PACIFIC WOOD PRODUCTS LLC
Private
Nearby Dams
Frequently Asked Questions
What is the hazard classification of Temple Eastex Dam B 2?
Temple Eastex Dam B 2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Temple Eastex Dam B 2?
Temple Eastex Dam B 2 is owned by GEORGIA-PACIFIC WOOD PRODUCTS LLC (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Temple Eastex Dam B 2 built?
Temple Eastex Dam B 2 was completed in 1965, making it 61 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Temple Eastex Dam B 2?
Temple Eastex Dam B 2 serves the following purposes: Other. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Temple Eastex Dam B 2?
Temple Eastex Dam B 2 has a dam height of 17 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Temple Eastex Dam B 2 last inspected?
Temple Eastex Dam B 2 was last inspected on April 26, 2023. Inspection dates indicate when a formal review occurred, not the results of that inspection.