Tehuacana Creek WS SCS Site 18 Dam
Key Takeaway
Tehuacana Creek WS SCS Site 18 Dam is classified as high hazard in Texas. It was completed in 1969 and is 57 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 33 ft (taller than 74.3% in TX) |
| Dam Length | 4,500 ft |
| Dam Type | Earth |
| Max Storage | 1.5K acre-ft |
| Normal Storage | 141 acre-ft |
| Surface Area | 28 acres |
| Drainage Area | 2 sq mi |
| Max Discharge | 1,783 cfs |
| Year Completed | 1969 (57 years old) |
| NID ID | TX04107 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
MCLENNAN COUNTY;MCLENNAN COUNTY SWCD;MCLENNAN HILL COUNTIES TEHUACANA CREEK WCID 1
Local Government
Nearby Dams
Tehuacana Creek WS SCS Site 17 Dam
McLennan, TX
High Hazard 45 ftTehuacana Creek WS SCS Site 15 Dam
McLennan, TX
High Hazard 38 ftTehuacana Creek WS SCS Site 16 Dam
McLennan, TX
Low Hazard 32 ftTehuacana Creek WS SCS Site 14 Dam
McLennan, TX
High Hazard 35 ftYowell Lake Dam
McLennan, TX
Low Hazard 18 ftWo Gross Jr Dam
McLennan, TX
High Hazard 15 ftTehuacana Creek WS SCS Site 12 Dam
McLennan, TX
Low Hazard 44 ftDenton Lake Dam
McLennan, TX
Low Hazard 30 ftFrequently Asked Questions
What is the hazard classification of Tehuacana Creek WS SCS Site 18 Dam?
Tehuacana Creek WS SCS Site 18 Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Tehuacana Creek WS SCS Site 18 Dam?
Tehuacana Creek WS SCS Site 18 Dam is owned by MCLENNAN COUNTY;MCLENNAN COUNTY SWCD;MCLENNAN HILL COUNTIES TEHUACANA CREEK WCID 1 (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Tehuacana Creek WS SCS Site 18 Dam built?
Tehuacana Creek WS SCS Site 18 Dam was completed in 1969, making it 57 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Tehuacana Creek WS SCS Site 18 Dam?
Tehuacana Creek WS SCS Site 18 Dam serves the following purposes: Flood Risk Reduction, Fire Protection, Stock, Or Small Fish Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Tehuacana Creek WS SCS Site 18 Dam?
Tehuacana Creek WS SCS Site 18 Dam has a dam height of 33 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Tehuacana Creek WS SCS Site 18 Dam last inspected?
Tehuacana Creek WS SCS Site 18 Dam was last inspected on November 1, 2018. Inspection dates indicate when a formal review occurred, not the results of that inspection.