Key Takeaway
Sunbury Upground Reservoir No. 2 is classified as high hazard in Ohio. It was completed in 1964 and is 62 years old. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 20 ft (taller than 27.7% in OH) |
| Dam Length | 2,535 ft |
| Dam Type | Earth |
| Max Storage | 128 acre-ft |
| Normal Storage | 110 acre-ft |
| Surface Area | 9 acres |
| Drainage Area | 0 sq mi |
| Max Discharge | 6 cfs |
| Year Completed | 1964 (62 years old) |
| NID ID | OH00747 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Village of Sunbury
Local Government
Nearby Dams
Sunbury Upground Reservoir No. 1
Delaware, OH
High Hazard 17 ftBerkshire Lake Dam
Delaware, OH
Low Hazard 28 ftPomeroy Pond No. 1 Dam
Delaware, OH
Low Hazard 29 ftPomeroy Pond No. 2 Dam
Delaware, OH
Low Hazard 32 ftHorace Troop Pond Dam
Delaware, OH
High Hazard 21 ftSomoco Wwt Lagoon
Morrow, OH
Significant Hazard 19 ftWesterville Reservoir Dam
Delaware, OH
High Hazard 47 ftAlum Creek Dam
Delaware, OH
High HazardFrequently Asked Questions
What is the hazard classification of Sunbury Upground Reservoir No. 2?
Sunbury Upground Reservoir No. 2 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Sunbury Upground Reservoir No. 2?
Sunbury Upground Reservoir No. 2 is owned by Village of Sunbury (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Sunbury Upground Reservoir No. 2 built?
Sunbury Upground Reservoir No. 2 was completed in 1964, making it 62 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Sunbury Upground Reservoir No. 2?
Sunbury Upground Reservoir No. 2 serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Sunbury Upground Reservoir No. 2?
Sunbury Upground Reservoir No. 2 has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Sunbury Upground Reservoir No. 2 last inspected?
Sunbury Upground Reservoir No. 2 was last inspected on December 23, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.