Strom Dam
Key Takeaway
Strom Dam is classified as high hazard in South Carolina. Its primary use is recreation. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 19 ft (taller than 41.8% in SC) |
| Max Storage | 35 acre-ft |
| Normal Storage | 20 acre-ft |
| Surface Area | 2 acres |
| NID ID | SC02492 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
THOMAS E STROM
Private
Nearby Dams
Sweetwater INC Dam
Greenville, SC
High Hazard 35 ftJoe Williams Pond Dam
Greenville, SC
Low Hazard 38 ftCliffs Valley Golf Course Dam 1
Greenville, SC
Low Hazard 27 ftCliffs Valley Golf Course Dam 2
Greenville, SC
Low Hazard 28 ftRice Pond Dam
Greenville, SC
Low Hazard 22 ftAwanita Lake Dam
Greenville, SC
Low Hazard 25 ftSam Hoffman Pond Dam
Greenville, SC
High Hazard 22 ftN Morgan Pond Dam
Greenville, SC
Significant Hazard 29 ftFrequently Asked Questions
What is the hazard classification of Strom Dam?
Strom Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Strom Dam?
Strom Dam is owned by THOMAS E STROM (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Strom Dam?
Strom Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Strom Dam?
Strom Dam has a dam height of 19 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Strom Dam last inspected?
Strom Dam was last inspected on November 22, 2021. Inspection dates indicate when a formal review occurred, not the results of that inspection.