Stonehaven Dam
Key Takeaway
Stonehaven Dam is classified as low hazard in Virginia. Its primary use is recreation.
Physical Details
| Dam Height | 8 ft (taller than 0.5% in VA) |
| Dam Type | Earth |
| Max Storage | 193 acre-ft |
| Normal Storage | 145 acre-ft |
| Surface Area | 24 acres |
| Drainage Area | 1 sq mi |
| NID ID | VA085026 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Cochrane Design and Development
Private
Nearby Dams
Goldmine Creek Dam
Hanover, VA
Unknown 15 ftMission Court Lake Dam
Hanover, VA
Unknown 22 ftFeldspar Corp. Dam #2
Hanover, VA
Unknown 25 ftHidden Lake Dam
Hanover, VA
Unknown 19 ftNumber 1 Impoundment
Hanover, VA
Unknown 10 ftSilica Dam
Hanover, VA
Unknown 28 ftWhite Dam #1
Hanover, VA
Unknown 16 ftFeldspar Corp. Dam #1
Hanover, VA
Unknown 25 ftFrequently Asked Questions
What is the hazard classification of Stonehaven Dam?
Stonehaven Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Stonehaven Dam?
Stonehaven Dam is owned by Cochrane Design and Development (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Stonehaven Dam?
Stonehaven Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Stonehaven Dam?
Stonehaven Dam has a dam height of 8 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Stonehaven Dam last inspected?
Stonehaven Dam was last inspected on September 17, 2019. Inspection dates indicate when a formal review occurred, not the results of that inspection.