Stockton Hill

UNNAMED WASH· Mohave, Arizona· Built 1997· Earth· 27 ft tall
Low Hazard Recreation Private

Key Takeaway

Stockton Hill is classified as low hazard in Arizona. It was completed in 1997 and is 29 years old. Its primary use is recreation.

Physical Details

Dam Height 27 ft (taller than 47.2% in AZ)
Dam Length790 ft
Dam TypeEarth
Max Storage145 acre-ft
Normal Storage69 acre-ft
Surface Area8 acres
Drainage Area3 sq mi
Max Discharge2,910 cfs
Year Completed1997 (29 years old)
NID IDAZ00219

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: April 27, 2012
State Regulated: Yes
Regulatory Agency: ARIZONA DEPARTMENT OF WATER RESOURCES

Ownership

PATRICIA LEWIS

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Stockton Hill?

Stockton Hill is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Stockton Hill?

Stockton Hill is owned by PATRICIA LEWIS (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Stockton Hill built?

Stockton Hill was completed in 1997, making it 29 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Stockton Hill?

Stockton Hill serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Stockton Hill?

Stockton Hill has a dam height of 27 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Stockton Hill last inspected?

Stockton Hill was last inspected on April 27, 2012. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.