Spring Lake Dam
Key Takeaway
Spring Lake Dam is classified as low hazard in Georgia. Its primary use is recreation.
Physical Details
| Dam Height | 28 ft (taller than 69.6% in GA) |
| Dam Length | 189 ft |
| Dam Type | Earth |
| Max Storage | 61 acre-ft |
| Normal Storage | 46 acre-ft |
| Surface Area | 4 acres |
| Drainage Area | 0 sq mi |
| NID ID | GA07022 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Boyd, Barry
Private
Nearby Dams
Lake Ashley Dam
Carroll, GA
High Hazard 57 ftTara Lake Dam
Carroll, GA
High Hazard 101 ftSims Lake Dam
Douglas, GA
Low Hazard 25 ftWillis Lake Dam
Carroll, GA
Low Hazard 16 ftMoccasin Lake Dam
Douglas, GA
Low Hazard 25 ftHudson Lake Dam
Douglas, GA
Low Hazard 26 ftOld Villa Rica Water Works Lake Dam
Carroll, GA
Low Hazard 29 ftStrickland Lake Dam
Douglas, GA
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Spring Lake Dam?
Spring Lake Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Spring Lake Dam?
Spring Lake Dam is owned by Boyd, Barry (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Spring Lake Dam?
Spring Lake Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Spring Lake Dam?
Spring Lake Dam has a dam height of 28 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Spring Lake Dam last inspected?
Spring Lake Dam was last inspected on December 15, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.