Spring Canyon

SPRING CANYON· Goshen, Wyoming· Built 1979· Earth· 58 ft tall

Key Takeaway

Spring Canyon is classified as high hazard in Wyoming. It was completed in 1979 and is 47 years old. Its primary use is fire protection. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 58 ft (taller than 95.7% in WY)
Dam Length1,700 ft
Dam TypeEarth
Normal Storage1.3K acre-ft
Surface Area82 acres
Drainage Area8 sq mi
Max Discharge5,144 cfs
Year Completed1979 (47 years old)
NID IDWY01879

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: April 20, 2020
State Regulated: Yes
Regulatory Agency: SEO

Ownership

LUCERNE CANAL AND DITCH COMPANY

Private

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Spring Canyon?

Spring Canyon is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Spring Canyon?

Spring Canyon is owned by LUCERNE CANAL AND DITCH COMPANY (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Spring Canyon built?

Spring Canyon was completed in 1979, making it 47 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Spring Canyon?

Spring Canyon serves the following purposes: Fire Protection, Stock, Or Small Fish Pond, Other, Fish And Wildlife Pond. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Spring Canyon?

Spring Canyon has a dam height of 58 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Spring Canyon last inspected?

Spring Canyon was last inspected on April 20, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.