Southeast Reservoir Dam
Key Takeaway
Southeast Reservoir Dam is classified as significant hazard in New York. It was completed in 1972 and is 54 years old. Its primary use is water supply. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 25 ft (taller than 69.7% in NY) |
| Dam Length | 1,600 ft |
| Dam Type | Earth |
| Max Storage | 96 acre-ft |
| Normal Storage | 72 acre-ft |
| Surface Area | 12 acres |
| Year Completed | 1972 (54 years old) |
| NID ID | NY00737 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
MONROE COUNTY WATER AUTHORITY
Local Government
Nearby Dams
Hugh Hunter Recreational Pond Dam
Monroe, NY
Low Hazard 15 ftCartersville Spillway Dam
Monroe, NY
High Hazard 18 ftAllen's Creek East Branch Drainage Project Dam
Monroe, NY
Low Hazard 19 ftBushnells Basin Sluice Gate Dam
Monroe, NY
High Hazard 17 ftLock 32 Dam Erie Canal
Monroe, NY
High Hazard 40 ftLock 33 Dam Erie Canal
Monroe, NY
High Hazard 40 ftSouthern Hills Detention Pond Dam
Monroe, NY
Significant Hazard 14 ftFairport Spillway Dam
Monroe, NY
High HazardFrequently Asked Questions
What is the hazard classification of Southeast Reservoir Dam?
Southeast Reservoir Dam is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Southeast Reservoir Dam?
Southeast Reservoir Dam is owned by MONROE COUNTY WATER AUTHORITY (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Southeast Reservoir Dam built?
Southeast Reservoir Dam was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Southeast Reservoir Dam?
Southeast Reservoir Dam serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Southeast Reservoir Dam?
Southeast Reservoir Dam has a dam height of 25 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Southeast Reservoir Dam last inspected?
Southeast Reservoir Dam was last inspected on August 25, 2016. Inspection dates indicate when a formal review occurred, not the results of that inspection.