Smith Lake Number 2 Dam
Key Takeaway
Smith Lake Number 2 Dam is classified as low hazard in Mississippi. Its primary use is recreation.
Physical Details
| Dam Height | 20 ft (taller than 60.2% in MS) |
| Dam Type | Earth |
| Max Storage | 180 acre-ft |
| NID ID | MS01284 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Private
Nearby Dams
Renno Sportsman Lake Dam
Rankin, MS
Low Hazard 27 ftRees Lake Number 2 Dam
Rankin, MS
Low Hazard 40 ftCleary Lake Dam
Rankin, MS
High Hazard 14 ftHoover Lake Dam
Rankin, MS
High Hazard 21 ftRees Lake Dam
Rankin, MS
Low Hazard 20 ftSwim Lake Dam
Rankin, MS
Low Hazard 20 ftConfederate Heights Golf Number 2 Dam
Rankin, MS
Low Hazard 12 ftRaymond Brothers Lake Dam
Rankin, MS
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of Smith Lake Number 2 Dam?
Smith Lake Number 2 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Smith Lake Number 2 Dam?
Smith Lake Number 2 Dam is owned by information not available (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Smith Lake Number 2 Dam?
Smith Lake Number 2 Dam serves the following purposes: Recreation. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Smith Lake Number 2 Dam?
Smith Lake Number 2 Dam has a dam height of 20 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Smith Lake Number 2 Dam last inspected?
Smith Lake Number 2 Dam was last inspected on June 29, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.