Slurry Pond No. 3
Key Takeaway
Slurry Pond No. 3 is classified as low hazard in Alabama. Its primary use is water supply.
Physical Details
| Dam Height | 50 ft (taller than 93.5% in AL) |
| Dam Type | Earth |
| Max Storage | 540 acre-ft |
| NID ID | AL83462 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Jim Walter Resources, Inc.
Private
Nearby Dams
Slurry Impoundment #4
Jefferson, AL
Low Hazard 100 ftFresh Water Impoundment #2
Jefferson, AL
Low Hazard 27 ftBlue Creek Mine #3 - Impoundment #2
Jefferson, AL
Low HazardBlue Creek Mine #3 - Impoundment #1
Jefferson, AL
Low HazardSlurry Impoundment - Johns Washer
Jefferson, AL
Low HazardOak Grove Mine Lake
Jefferson, AL
Low HazardBlack Diamond Lake
Jefferson, AL
Low HazardBlue Creek Lake
Jefferson, AL
Low HazardFrequently Asked Questions
What is the hazard classification of Slurry Pond No. 3?
Slurry Pond No. 3 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Slurry Pond No. 3?
Slurry Pond No. 3 is owned by Jim Walter Resources, Inc. (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
What is the primary purpose of Slurry Pond No. 3?
Slurry Pond No. 3 serves the following purposes: Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Slurry Pond No. 3?
Slurry Pond No. 3 has a dam height of 50 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Slurry Pond No. 3 last inspected?
Slurry Pond No. 3 was last inspected on March 3, 2004. Inspection dates indicate when a formal review occurred, not the results of that inspection.