Simco-Peabody Sediment Pond E-1 Dam
Key Takeaway
Simco-Peabody Sediment Pond E-1 Dam is classified as low hazard in Ohio. It was completed in 1982 and is 44 years old. Its primary use is tailings.
Physical Details
| Dam Height | 32 ft (taller than 67.5% in OH) |
| Dam Length | 560 ft |
| Dam Type | Earth |
| Max Storage | 116 acre-ft |
| Normal Storage | 41 acre-ft |
| Surface Area | 5 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 353 cfs |
| Year Completed | 1982 (44 years old) |
| NID ID | OH02216 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Holmes Limestone Company
Private
Nearby Dams
Simco-Peabody Sediment Pond No. 28 Dam
Muskingum, OH
Low Hazard 26 ftSimco Sediment Pond E-55 Dam
Coshocton, OH
Low Hazard 34 ftColumbus Southern Power Company Dam Ma-11
Muskingum, OH
Low Hazard 23 ftDarrow Lake Dam
Guernsey, OH
Low Hazard 26 ftDarrow Lake No. 1 Dam (Upper)
Guernsey, OH
Significant Hazard 26 ftHerbert Pond Dam
Coshocton, OH
Low Hazard 26 ftWills Creek Dam
Coshocton, OH
High HazardRitz Lake Dam
Guernsey, OH
Low Hazard 30 ftFrequently Asked Questions
What is the hazard classification of Simco-Peabody Sediment Pond E-1 Dam?
Simco-Peabody Sediment Pond E-1 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Simco-Peabody Sediment Pond E-1 Dam?
Simco-Peabody Sediment Pond E-1 Dam is owned by Holmes Limestone Company (Private). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Simco-Peabody Sediment Pond E-1 Dam built?
Simco-Peabody Sediment Pond E-1 Dam was completed in 1982, making it 44 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Simco-Peabody Sediment Pond E-1 Dam?
Simco-Peabody Sediment Pond E-1 Dam serves the following purposes: Tailings. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Simco-Peabody Sediment Pond E-1 Dam?
Simco-Peabody Sediment Pond E-1 Dam has a dam height of 32 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Simco-Peabody Sediment Pond E-1 Dam last inspected?
Simco-Peabody Sediment Pond E-1 Dam was last inspected on December 7, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.