Settingdown Creek WS Str # 56
Key Takeaway
Settingdown Creek WS Str # 56 is classified as high hazard in Georgia. It was completed in 1954 and is 72 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 29 ft (taller than 73.2% in GA) |
| Dam Length | 420 ft |
| Dam Type | Earth |
| Max Storage | 341 acre-ft |
| Surface Area | 6 acres |
| Drainage Area | 1 sq mi |
| Year Completed | 1954 (72 years old) |
| Year Modified | 1985 |
| NID ID | GA00554 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Upper Chattahoochee River SWCD
State Government
Nearby Dams
Settingdown Creek WS Str # 4
Forsyth, GA
High Hazard 29 ftSettingdown Creek WS Str # 59
Forsyth, GA
High Hazard 26 ftKalb Lake Dam
Forsyth, GA
Low Hazard 26 ftSettingdown Creek WS Str # 6
Forsyth, GA
High Hazard 26 ftSettingdown Creek WS Str # 54
Forsyth, GA
High Hazard 22 ftTyson Proteins Oxidation Pond Dam
Forsyth, GA
High Hazard 55 ftAmerican Proteins Lake Dam
Forsyth, GA
Low Hazard 30 ftDunroven Lake Dam
Forsyth, GA
High Hazard 34 ftFrequently Asked Questions
What is the hazard classification of Settingdown Creek WS Str # 56?
Settingdown Creek WS Str # 56 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Settingdown Creek WS Str # 56?
Settingdown Creek WS Str # 56 is owned by Upper Chattahoochee River SWCD (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Settingdown Creek WS Str # 56 built?
Settingdown Creek WS Str # 56 was completed in 1954, making it 72 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Settingdown Creek WS Str # 56?
Settingdown Creek WS Str # 56 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Settingdown Creek WS Str # 56?
Settingdown Creek WS Str # 56 has a dam height of 29 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was Settingdown Creek WS Str # 56 last inspected?
Settingdown Creek WS Str # 56 was last inspected on March 28, 2017. Inspection dates indicate when a formal review occurred, not the results of that inspection.