Senatobia Creek Watershed Structure Y-7-01 Dam
Key Takeaway
Senatobia Creek Watershed Structure Y-7-01 Dam is classified as low hazard in Mississippi. It was completed in 1966 and is 60 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 26 ft (taller than 82.3% in MS) |
| Dam Type | Earth |
| Max Storage | 137 acre-ft |
| Drainage Area | 0 sq mi |
| Year Completed | 1966 (60 years old) |
| NID ID | MS01143 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
Local Government
Nearby Dams
M P Moore Pond Number 2 Dam
Tate, MS
Low Hazard 14 ftMs05705 Lake Dam
Tate, MS
Low Hazard 17 ftSenatobia Creek Watershed Structure Y-7-11 Dam
Panola, MS
Low Hazard 31 ftMs05706 Lake Dam
Tate, MS
Low Hazard 16 ftSenatobia Creek Watershed Structure Y 7 08 Dam
Panola, MS
Low Hazard 25 ftHickahala Creek WS Str C-34-9 Dam
Tate, MS
Low Hazard 19 ftMs05602 Lake Dam
Tate, MS
Low Hazard 16 ftMs05604 Lake Dam
Tate, MS
Low Hazard 19 ftFrequently Asked Questions
What is the hazard classification of Senatobia Creek Watershed Structure Y-7-01 Dam?
Senatobia Creek Watershed Structure Y-7-01 Dam is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates Senatobia Creek Watershed Structure Y-7-01 Dam?
Senatobia Creek Watershed Structure Y-7-01 Dam is owned by information not available (Local Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was Senatobia Creek Watershed Structure Y-7-01 Dam built?
Senatobia Creek Watershed Structure Y-7-01 Dam was completed in 1966, making it 60 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of Senatobia Creek Watershed Structure Y-7-01 Dam?
Senatobia Creek Watershed Structure Y-7-01 Dam serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is Senatobia Creek Watershed Structure Y-7-01 Dam?
Senatobia Creek Watershed Structure Y-7-01 Dam has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.