Key Takeaway
SCS-Upper Washita Creek Site-033 is classified as low hazard in Oklahoma. It was completed in 1961 and is 65 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 48 ft (taller than 93.1% in OK) |
| Dam Length | 1,308 ft |
| Dam Type | Earth |
| Max Storage | 876 acre-ft |
| Normal Storage | 375 acre-ft |
| Surface Area | 40 acres |
| Max Discharge | 4,425 cfs |
| Year Completed | 1961 (65 years old) |
| NID ID | OK00980 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
UPPER WASHITA CONS DIST
State Government
Nearby Dams
Upper Washita River WS SCS Site 32 Dam
Hemphill, TX
Low Hazard 35 ftSCS-Upper Washita Creek Site-034
Roger Mills, OK
Low Hazard 41 ftSCS-Upper Washita Creek Site-035
Roger Mills, OK
Low Hazard 45 ftLocke Dam 2
Roger Mills, TX
Low Hazard 29 ftUpper Washita River WS SCS Site 30 Dam
Hemphill, TX
Low Hazard 42 ftLedrick Estate Dam
Roger Mills, TX
Low Hazard 28 ftSCS-Upper Washita Creek Site-036
Roger Mills, OK
Low Hazard 35 ftSCS-Upper Washita Creek Site-065
Roger Mills, OK
Low Hazard 36 ftFrequently Asked Questions
What is the hazard classification of SCS-Upper Washita Creek Site-033?
SCS-Upper Washita Creek Site-033 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Upper Washita Creek Site-033?
SCS-Upper Washita Creek Site-033 is owned by UPPER WASHITA CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Upper Washita Creek Site-033 built?
SCS-Upper Washita Creek Site-033 was completed in 1961, making it 65 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Upper Washita Creek Site-033?
SCS-Upper Washita Creek Site-033 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Upper Washita Creek Site-033?
SCS-Upper Washita Creek Site-033 has a dam height of 48 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Upper Washita Creek Site-033 last inspected?
SCS-Upper Washita Creek Site-033 was last inspected on January 1, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.