Key Takeaway
SCS-Upper Clear Boggy Creek Site-03 is classified as low hazard in Oklahoma. It was completed in 1961 and is 65 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 24 ft (taller than 26.9% in OK) |
| Dam Length | 720 ft |
| Dam Type | Earth |
| Max Storage | 484 acre-ft |
| Normal Storage | 40 acre-ft |
| Surface Area | 10 acres |
| Max Discharge | 880 cfs |
| Year Completed | 1961 (65 years old) |
| NID ID | OK12159 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
COAL CO CONS DIST
State Government
Nearby Dams
SCS-Upper Clear Boggy Creek Site-02
Coal, OK
Low Hazard 22 ftSCS-Upper Clear Boggy Creek Site-04
Coal, OK
Low Hazard 25 ftSCS-Upper Clear Boggy Creek Site-01
Coal, OK
Low Hazard 27 ftOknoname 029001
Coal, OK
Low Hazard 30 ftSCS-Leader-Mid Clr Boggy Cr Site-10
Coal, OK
Low Hazard 23 ftPope
Coal, OK
Low Hazard 35 ftSCS-Upper Clear Boggy Creek Site-06
Coal, OK
Low Hazard 25 ftSCS-Leader-Mid Clr Boggy Cr Site-36
Coal, OK
Low Hazard 28 ftFrequently Asked Questions
What is the hazard classification of SCS-Upper Clear Boggy Creek Site-03?
SCS-Upper Clear Boggy Creek Site-03 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Upper Clear Boggy Creek Site-03?
SCS-Upper Clear Boggy Creek Site-03 is owned by COAL CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Upper Clear Boggy Creek Site-03 built?
SCS-Upper Clear Boggy Creek Site-03 was completed in 1961, making it 65 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Upper Clear Boggy Creek Site-03?
SCS-Upper Clear Boggy Creek Site-03 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Upper Clear Boggy Creek Site-03?
SCS-Upper Clear Boggy Creek Site-03 has a dam height of 24 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Upper Clear Boggy Creek Site-03 last inspected?
SCS-Upper Clear Boggy Creek Site-03 was last inspected on January 1, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.