SCS-Upper Black Bear Creek Site-49
Key Takeaway
SCS-Upper Black Bear Creek Site-49 is classified as significant hazard in Oklahoma. It was completed in 1972 and is 54 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 44 ft (taller than 89.5% in OK) |
| Dam Length | 1,650 ft |
| Dam Type | Earth |
| Max Storage | 908 acre-ft |
| Normal Storage | 124 acre-ft |
| Surface Area | 25 acres |
| Max Discharge | 3,496 cfs |
| Year Completed | 1972 (54 years old) |
| NID ID | OK01202 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
GARFIELD CO CONS DIST
State Government
Nearby Dams
SCS-Upper Black Bear Creek Site-48
Garfield, OK
Significant Hazard 53 ftSCS-Upper Black Bear Creek Site-51
Noble, OK
Significant Hazard 52 ftSCS-Upper Black Bear Creek Site-50
Noble, OK
Low Hazard 40 ftSCS-Upper Black Bear Creek Site-47
Noble, OK
Low Hazard 33 ftSCS-Upper Black Bear Creek Site-43
Garfield, OK
Low Hazard 42 ftSCS-Upper Black Bear Creek Site-53
Noble, OK
Significant Hazard 37 ftSCS-Upper Black Bear Creek Site-42
Garfield, OK
Low Hazard 35 ftSCS-Upper Black Bear Creek Site-41
Garfield, OK
Low Hazard 56 ftFrequently Asked Questions
What is the hazard classification of SCS-Upper Black Bear Creek Site-49?
SCS-Upper Black Bear Creek Site-49 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Upper Black Bear Creek Site-49?
SCS-Upper Black Bear Creek Site-49 is owned by GARFIELD CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Upper Black Bear Creek Site-49 built?
SCS-Upper Black Bear Creek Site-49 was completed in 1972, making it 54 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Upper Black Bear Creek Site-49?
SCS-Upper Black Bear Creek Site-49 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Upper Black Bear Creek Site-49?
SCS-Upper Black Bear Creek Site-49 has a dam height of 44 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Upper Black Bear Creek Site-49 last inspected?
SCS-Upper Black Bear Creek Site-49 was last inspected on November 21, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.