SCS-Timber Creek Site-3
Key Takeaway
SCS-Timber Creek Site-3 is classified as low hazard in Oklahoma. It was completed in 1962 and is 64 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 46 ft (taller than 92% in OK) |
| Dam Length | 1,800 ft |
| Dam Type | Earth |
| Max Storage | 969 acre-ft |
| Normal Storage | 175 acre-ft |
| Surface Area | 25 acres |
| Max Discharge | 3,990 cfs |
| Year Completed | 1962 (64 years old) |
| NID ID | OK00016 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BECKHAM CO CONS DIST
State Government
Nearby Dams
SCS-Timber Creek Site-2
Beckham, OK
Significant Hazard 40 ftSCS-Timber Creek Site-4
Beckham, OK
Low Hazard 34 ftSCS-Ter Creek Site-1
Beckham, OK
Low Hazard 57 ftSCS-Timber Creek Site-5
Beckham, OK
Significant Hazard 38 ftSCS-Timber Creek Site-7
Beckham, OK
Significant Hazard 49 ftSCS-Timber Creek Site-6
Beckham, OK
Significant Hazard 44 ftHickey
Beckham, OK
Low Hazard 29 ftSCS-Sandstone Creek Site-111
Beckham, OK
Low Hazard 37 ftFrequently Asked Questions
What is the hazard classification of SCS-Timber Creek Site-3?
SCS-Timber Creek Site-3 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Timber Creek Site-3?
SCS-Timber Creek Site-3 is owned by BECKHAM CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Timber Creek Site-3 built?
SCS-Timber Creek Site-3 was completed in 1962, making it 64 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Timber Creek Site-3?
SCS-Timber Creek Site-3 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Timber Creek Site-3?
SCS-Timber Creek Site-3 has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Timber Creek Site-3 last inspected?
SCS-Timber Creek Site-3 was last inspected on January 1, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.