SCS-Sandstone Creek Site-010 is classified as low hazard in Oklahoma. It was completed in 1951 and is 75 years old. Its primary use is flood risk reduction.
Physical Details
| Dam Height | 46 ft (taller than 92% in OK) |
| Dam Length | 1,220 ft |
| Dam Type | Earth |
| Max Storage | 706 acre-ft |
| Normal Storage | 411 acre-ft |
| Surface Area | 36 acres |
| Max Discharge | 2,532 cfs |
| Year Completed | 1951 (75 years old) |
| NID ID | OK00023 |
Safety Information
No probable loss of human life and low economic/environmental losses expected.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
BECKHAM CO CONS DIST
State Government
Nearby Dams
SCS-Sandstone Creek Site-010a
Beckham, OK
Low Hazard 44 ftSCS-Sandstone Creek Site-110
Beckham, OK
Low Hazard 41 ftSCS-Sandstone Creek Site-111
Beckham, OK
Low Hazard 37 ftSCS-Sandstone Creek Site-109
Beckham, OK
Low Hazard 40 ftSCS-Sandstone Creek Site-108
Beckham, OK
Low Hazard 30 ftSCS-Sandstone Creek Site-009
Beckham, OK
Low Hazard 50 ftSCS-Sandstone Creek Site-011
Beckham, OK
Low Hazard 40 ftSCS-Sandstone Creek Site-008
Beckham, OK
Low Hazard 32 ftFrequently Asked Questions
What is the hazard classification of SCS-Sandstone Creek Site-010?
SCS-Sandstone Creek Site-010 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Sandstone Creek Site-010?
SCS-Sandstone Creek Site-010 is owned by BECKHAM CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Sandstone Creek Site-010 built?
SCS-Sandstone Creek Site-010 was completed in 1951, making it 75 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Sandstone Creek Site-010?
SCS-Sandstone Creek Site-010 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Sandstone Creek Site-010?
SCS-Sandstone Creek Site-010 has a dam height of 46 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Sandstone Creek Site-010 last inspected?
SCS-Sandstone Creek Site-010 was last inspected on January 1, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.