SCS-Robinson Creek Site-2

TR-WARSHAM CR· Lincoln, Oklahoma· Built 1981· Earth· 26 ft tall
Low Hazard Flood Risk Reduction State Government

Key Takeaway

SCS-Robinson Creek Site-2 is classified as low hazard in Oklahoma. It was completed in 1981 and is 45 years old. Its primary use is flood risk reduction.

Physical Details

Dam Height 26 ft (taller than 38.9% in OK)
Dam Length1,125 ft
Dam TypeEarth
Max Storage440 acre-ft
Normal Storage115 acre-ft
Surface Area14 acres
Drainage Area1 sq mi
Max Discharge480 cfs
Year Completed1981 (45 years old)
NID IDOK21523

Safety Information

Low Hazard

No probable loss of human life and low economic/environmental losses expected.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: No
Last Inspection: January 1, 1980
State Regulated: Yes
Regulatory Agency: OWRB

Ownership

LINCOLN CO CONS DIST

State Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of SCS-Robinson Creek Site-2?

SCS-Robinson Creek Site-2 is classified as Low Hazard. No probable loss of human life and low economic/environmental losses expected. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates SCS-Robinson Creek Site-2?

SCS-Robinson Creek Site-2 is owned by LINCOLN CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was SCS-Robinson Creek Site-2 built?

SCS-Robinson Creek Site-2 was completed in 1981, making it 45 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of SCS-Robinson Creek Site-2?

SCS-Robinson Creek Site-2 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is SCS-Robinson Creek Site-2?

SCS-Robinson Creek Site-2 has a dam height of 26 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was SCS-Robinson Creek Site-2 last inspected?

SCS-Robinson Creek Site-2 was last inspected on January 1, 1980. Inspection dates indicate when a formal review occurred, not the results of that inspection.

Data from the National Inventory of Dams (NID) maintained by the US Army Corps of Engineers. Dam conditions may have changed since the last update. This site is not affiliated with USACE. Do not use for emergency planning — contact your local dam safety program.