SCS-Quartermaster Creek Site-19 is classified as significant hazard in Oklahoma. It was completed in 1961 and is 65 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 38 ft (taller than 80.3% in OK) |
| Dam Length | 817 ft |
| Dam Type | Earth |
| Max Storage | 470 acre-ft |
| Normal Storage | 126 acre-ft |
| Surface Area | 21 acres |
| Max Discharge | 9,110 cfs |
| Year Completed | 1961 (65 years old) |
| NID ID | OK00386 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
CUSTER CO CONS DIST
State Government
Nearby Dams
Kendall
Custer, OK
Low Hazard 27 ftSCS-Quartermaster Creek Site-31
Custer, OK
Low Hazard 35 ftSCS-Quartermaster Creek Site-25
Custer, OK
Low Hazard 39 ftSCS-Quartermaster Creek Site-19a
Roger Mills, OK
High Hazard 34 ftSCS-Quartermaster Creek Site-19b
Custer, OK
Low Hazard 34 ftSCS-Quartermaster Creek Site-15
Roger Mills, OK
Low Hazard 27 ftSCS-Quartermaster Creek Site-24
Custer, OK
Low Hazard 34 ftSCS-Quartermaster Creek Site-23
Custer, OK
Low Hazard 41 ftFrequently Asked Questions
What is the hazard classification of SCS-Quartermaster Creek Site-19?
SCS-Quartermaster Creek Site-19 is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Quartermaster Creek Site-19?
SCS-Quartermaster Creek Site-19 is owned by CUSTER CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Quartermaster Creek Site-19 built?
SCS-Quartermaster Creek Site-19 was completed in 1961, making it 65 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Quartermaster Creek Site-19?
SCS-Quartermaster Creek Site-19 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Quartermaster Creek Site-19?
SCS-Quartermaster Creek Site-19 has a dam height of 38 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Quartermaster Creek Site-19 last inspected?
SCS-Quartermaster Creek Site-19 was last inspected on October 1, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.