Key Takeaway
SCS-Barnitz Creek Site-015a is classified as significant hazard in Oklahoma. It was completed in 1958 and is 68 years old. Its primary use is flood risk reduction. Significant hazard means failure could cause economic or environmental damage. Learn more.
Physical Details
| Dam Height | 40 ft (taller than 83.4% in OK) |
| Dam Length | 725 ft |
| Dam Type | Earth |
| Max Storage | 596 acre-ft |
| Normal Storage | 138 acre-ft |
| Surface Area | 19 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 1,700 cfs |
| Year Completed | 1958 (68 years old) |
| NID ID | OK00626 |
Safety Information
No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DEWEY CO CONS DIST
State Government
Nearby Dams
Ray Sawatsky
Dewey, OK
Low Hazard 29 ftSCS-Barnitz Creek Site-101
Dewey, OK
Low Hazard 41 ftSCS-Barnitz Creek Site-015
Dewey, OK
Low Hazard 47 ftSCS Barnitz Creek Site-014
Dewey, OK
High Hazard 46 ftSCS-Barnitz Creek Site-013
Dewey, OK
High Hazard 40 ftSCS-Barnitz Creek Site-028
Custer, OK
Low Hazard 53 ftOknoname 30223
Dewey, OK
Low Hazard 23 ftKoehn
Dewey, OK
Low Hazard 25 ftFrequently Asked Questions
What is the hazard classification of SCS-Barnitz Creek Site-015a?
SCS-Barnitz Creek Site-015a is classified as Significant Hazard. No probable loss of human life, but can cause economic loss, environmental damage, or disruption of lifeline facilities. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Barnitz Creek Site-015a?
SCS-Barnitz Creek Site-015a is owned by DEWEY CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Barnitz Creek Site-015a built?
SCS-Barnitz Creek Site-015a was completed in 1958, making it 68 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Barnitz Creek Site-015a?
SCS-Barnitz Creek Site-015a serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Barnitz Creek Site-015a?
SCS-Barnitz Creek Site-015a has a dam height of 40 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Barnitz Creek Site-015a last inspected?
SCS-Barnitz Creek Site-015a was last inspected on September 13, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.