SCS-Barnitz Creek Site-011
Key Takeaway
SCS-Barnitz Creek Site-011 is classified as high hazard in Oklahoma. It was completed in 1953 and is 73 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.
Physical Details
| Dam Height | 35 ft (taller than 72.5% in OK) |
| Dam Length | 928 ft |
| Dam Type | Earth |
| Max Storage | 575 acre-ft |
| Normal Storage | 391 acre-ft |
| Surface Area | 11 acres |
| Drainage Area | 1 sq mi |
| Max Discharge | 2,520 cfs |
| Year Completed | 1953 (73 years old) |
| NID ID | OK00631 |
Safety Information
Loss of human life is likely if the dam fails.
Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?
Ownership
DEWEY CO CONS DIST
State Government
Nearby Dams
SCS-Barnitz Creek Site-012
Dewey, OK
High Hazard 36 ftSCS-Barnitz Creek Site-023
Custer, OK
Low Hazard 40 ftSCS-Barnitz Creek Site-027
Custer, OK
Low Hazard 35 ftSCS-Barnitz Creek Site-013
Dewey, OK
High Hazard 40 ftSCS-Barnitz Creek Site-024
Custer, OK
Low Hazard 33 ftSCS-Barnitz Creek Site-017
Custer, OK
Low Hazard 44 ftKlontz-Cowden Pond 1
Custer, OK
Low Hazard 25 ftSCS Barnitz Creek Site-014
Dewey, OK
High Hazard 46 ftFrequently Asked Questions
What is the hazard classification of SCS-Barnitz Creek Site-011?
SCS-Barnitz Creek Site-011 is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.
Who owns and operates SCS-Barnitz Creek Site-011?
SCS-Barnitz Creek Site-011 is owned by DEWEY CO CONS DIST (State Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.
When was SCS-Barnitz Creek Site-011 built?
SCS-Barnitz Creek Site-011 was completed in 1953, making it 73 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.
What is the primary purpose of SCS-Barnitz Creek Site-011?
SCS-Barnitz Creek Site-011 serves the following purposes: Flood Risk Reduction. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.
How tall is SCS-Barnitz Creek Site-011?
SCS-Barnitz Creek Site-011 has a dam height of 35 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.
When was SCS-Barnitz Creek Site-011 last inspected?
SCS-Barnitz Creek Site-011 was last inspected on October 13, 2011. Inspection dates indicate when a formal review occurred, not the results of that inspection.