Sardis Dam

JACKFORK CREEK· Pushmataha, Oklahoma· Built 1982· Earth· 83 ft tall
High Hazard Flood Risk Reduction Other Recreation Water Supply Federal Government

Key Takeaway

Sardis Dam is classified as high hazard in Oklahoma. It was completed in 1982 and is 44 years old. Its primary use is flood risk reduction. High hazard means loss of life is likely if the dam fails — it does not indicate the dam's current condition. Learn more.

Physical Details

Dam Height 83 ft (taller than 99.1% in OK)
Dam Length14,138 ft
Dam TypeEarth
Max Storage735.8K acre-ft
Normal Storage274.3K acre-ft
Surface Area13,610 acres
Drainage Area275 sq mi
Max Discharge29,400 cfs
Year Completed1982 (44 years old)
NID IDOK22199

Safety Information

High Hazard

Loss of human life is likely if the dam fails.

Hazard potential describes downstream consequences of failure, not the dam's current condition. What does this mean?

Emergency Action Plan: Yes
Last Inspection: November 17, 2020
State Regulated: No

Ownership

USACE - Tulsa District

Federal Government

Nearby Dams

Frequently Asked Questions

What is the hazard classification of Sardis Dam?

Sardis Dam is classified as High Hazard. Loss of human life is likely if the dam fails. This classification refers to the potential downstream consequences of a failure, not the dam's current structural condition.

Who owns and operates Sardis Dam?

Sardis Dam is owned by USACE - Tulsa District (Federal Government). The owner is responsible for maintenance, inspections, and compliance with dam safety regulations.

When was Sardis Dam built?

Sardis Dam was completed in 1982, making it 44 years old. Many U.S. dams were built between the 1930s and 1970s during a period of major infrastructure investment.

What is the primary purpose of Sardis Dam?

Sardis Dam serves the following purposes: Flood Risk Reduction, Other, Recreation, Water Supply. Many dams in the U.S. are multi-purpose, supporting flood control, water supply, recreation, and other uses.

How tall is Sardis Dam?

Sardis Dam has a dam height of 83 ft. Dam height is measured from the natural streambed at the downstream toe to the top of the dam, and may differ from the visible height.

When was Sardis Dam last inspected?

Sardis Dam was last inspected on November 17, 2020. Inspection dates indicate when a formal review occurred, not the results of that inspection.